Darren Grant
(U of Alberta)
20/09/2014, 11:15
PINGU / ORCA
Presented will be the current status of the PINGU configuration and development plans.
Mr
Juergen Brunner
(o=desy-zeuthen,ou=Institutions,dc=icecube,dc=wisc,dc=edu)
20/09/2014, 11:30
PINGU / ORCA
ORCA - configuration and plans
Mr
Jannik Hofestaedt
(ECAP)
20/09/2014, 11:45
PINGU / ORCA
Reconstruction methods used in the ORCA feasibility study will be described. The performance of the track & shower reconstruction, and the FlavorID will shown.
Joao Pedro A M de Andre
(o=psu,ou=Institutions,dc=icecube,dc=wisc,dc=edu)
20/09/2014, 12:10
PINGU / ORCA
.